Model 107
107-THE COMPOUND
Designed for those who want more space, more flexibility, and more lifestyle. The Compound combines 2,950 sq ft of premium living with expansive outdoor spaces, a private gym, dedicated office, and luxury-inspired design built for modern families and elevated living.
2,950
sq ft
4
Bedrooms
3
Bathrooms
US$498K
DIY From
US$975K
Installed From

Quick Specifications
Footprint
2950 sq ft
Building Size
49 X 57
Roofing
I joist and Trusses
BC Step Code
Step Code Level 3
Build Time
16 Weeks
Tour the build
Inside the 107-THE COMPOUND .
Features & Systems
What goes into every 107-THE COMPOUND .
Structure
- โขEngineered timber floor joists at 19.2" o.c.
- โขPanelized 2x6 wood frame walls
- โขEngineered I Joist roof System and Engineered Trusses
- โขConcrete foundation system
Envelope
- โขRain screen and vapor barrier
- โขR-22 wall insulation
- โขR-40 attic insulation
- โขDouble-pane windows standard
Mechanical
- โขCold-climate heat pump
- โขHRV with HEPA-grade filtration
- โขHeat-recovery DHW
- โข200A main service panel (EV-ready)
Interior Finishes
- โขQuartz countertops
- โขSoft-close panelized cabinetry
- โข9' ceilings
- โขEngineered hardwood floors
Wall System Breakdown
Engineered, panel by panel.
- โขPanelized wood-frame construction
- โขFactory-controlled quality at every stage
- โขContinuous exterior insulation
- โขBuilt-in service cavity for wiring + plumbing

- โขEngineered for code compliance + high snow loads
- โขTriple-pane window upgrade available
- โข3rd-party tested for air-tightness
- โขDays, not weeks, to assemble on-site
Detailed Specifications
The full spec sheet.
| Component | Material | Specification | Notes |
|---|---|---|---|
| Foundation | Concrete Forms | 8" Wall | Torch On Membrane Foundation Waterproofing |
| Floor System | Engineered I-Joists | 11.875 @ 19'2 O.C. | OSB sub floor glewed and screwed |
| Exterior Walls | 2X6 Wood Stud | 9" Tall, 16 O.C. | Continuous R-Value >22 |
| Windows | Vinyl, Double Pane | U 0.18\ SHGC 0.30 | Triple Pane Upgrade Available |
| Roofing | Standing Seam Metal | 26-gauge, 16 panel | 40-yr Finish Warranty |
| HVAC | Cold Weather Heat Pump | 9 SEER / HSPF 12.5 / -25ยฐC | |
| Ventilation | High Efficiency HRV | 200 CFM, 80% recovery | HEPA-13 filtration |
Performance Comparison
How the 107-THE COMPOUND rates.
Energy Efficiency25%
Lower energy loss than conventional build average
Structural Strength80%
Exceeds NBC 2020 by 40%
Build Speed80%
14 weeks vs. 32 weeks site-built
Air Tightness40%
2.50 ACH50
Annual Operating Costs
New Leaf Conventional Build
JanFebMarAprMayJunJulAugSepOctNovDec
Documents
Architectural drawings.
Walkthrough
See it in motion.
Location & Availability
Where we deliver.
Delivery available within 1,500 km of any New Leaf Vision facility. Lead times depend on configuration and current production queue.
Loading mapโฆ
BC+Alberta
Available-16 Week Lead Time
Ontario+Quebec
Available-24 Week Lead Time
Texas
Available-24 Week Lead Time
Florida
Available-24 Week Lead Time
Mexico-Bahia de Banderas
Available-16 Week Lead Time
Start Your Project
Ready to build your 107-THE COMPOUND ? Our team will guide you through every step โ from site assessment to keys in hand.
1
2
3
Tell us about your project
We'll match you with the right model and territory pricing.
107-THE COMPOUND
